
No.02 Manual · Handwheel Drive
Open the aisle
by hand.
Manual mobile shelving stacks every row on wheels and lets them share one aisle. A handwheel or crank turns a chain drive — twelve newtons of effort, self-locking, no electrical supply. The same welded steel platform as our intelligent range, bought without the motor.
Where the aisle goes § 01
Static rows waste one aisle per row.
Fixed shelving gives every row its own aisle — most of them empty, most of the time. Mobile bays roll on a shared rail and open a single aisle only where you stand, so the same floor holds roughly twice the storage.
- 700 mm aisle opened on demand between two compacted runs
- 100 mm clearance needed at each end of the rail — typical, confirmed per project
- One aisle shared across the whole run instead of one per row
- ≈2× storage density versus fixed shelving on the same footprint
Six house finishes § 02
Pick the colour. Or send us a RAL.
Free RAL matching on request — send a swatch and we match it on the powder line.
Every part, named § 03
Named on the drawing,
before it is welded.
The case for hand power § 04
What can manual shelving do for you?
- No motor to buy, power or maintain
- No wiring, no site power, no electrician
- Lower unit price than the intelligent range
- Same welded platform — same 480 kg bay load
- Near-silent: no motor whir, no fans, no beeps
- Nothing to reboot, update or recharge — ever
The long term § 05
A shelf is a fifteen-year decision. We warrant it like one.
Powder coat 60–80 µm baked at 180 °C · 8-stage pickling & phosphating · GB/T 13667.3 / 13667.4 · DA/T 65 · ISO 9001 · ISO 14001 · SGS-audited
A real project § 06
One sketch, one container plan.
Flat-packed, self-assembled.
Delivered · university library, Southeast Asia
- 620 m²archive floor, existing slab — no foundation works
- 96 baysdouble-sided, 2360 mm high, ivory powder coat
- 2 × 40 ftflat-packed container load, 1 180 cartons
- 2 peopleis all self-assembly takes — hand tools, drawings and a video guide included
“Everything arrived flat-packed and numbered. Our own maintenance crew bolted the run together over a weekend — no specialist contractor, no extra invoice.”
Library services manager · the client above
